SYSTEMS ENGINEERING MANAGEMENT PLAN

GROUP 6

SYSTEMS ENGINEERING COURSE 202 George Mason University May 6, 1999

1. OBJECTIVE: To develop a web site with capability of demonstrating a model of a dynamic system to undergraduate engineering students.

2. DELIVERABLES:

2.1 One email message with Universal Resource Locator (URL) of group web site to Klaskey@gmu.edu.

2.2 One email message with allocations of credit for assignment to Klaskey@gmu.edu.

3. SCHEDULE/MILESTONES:

3.1

  • Week beginning Feb 21, 1999
  • First team meeting
  • Develop skills matrix of assigned team members
  • Select project leader
  • Make email contact with all team members
  • Research information currently available on world wide web (WWW)
3.2
  • Week beginning Feb 28
  • Select group leader (Julia Maslov)
  • Develop Systems Engineering Management Plan (SEMP) using MS Project software
  • Conduct requirement analysis
  • Determine deliverables
  • Assign tasks and responsibilities
    • Project Leader - Julia Maslov
    • Design - Michael Bordell, Hassan Aitcaid, Bernardo DeLeon
    • Production (Web Site Development) - Julia Maslov and Bernardo DeLeon
  • Establish project organization
3.3
  • Week of Mar 7
  • Select system for case study
  • Write system description and diagram
  • Deliver SEMP to team members
  • Review production of web site main page
  • Review description of example, diagram, graphic

3.4

  • Week of Mar 14
  • Develop system model
  • Develop representation of system elements
  • Develop representation of free-body diagrams
  • Develop modeling equations
3.5
  • Week of Apr 4
  • Develop modeling equations
  • Web site development and implementation
3.6
  • Week of Apr 18
  • Analyze system stability
  • Plot system outputs
3.7
  • Week of Apr 25
  • Reevaluate system model
  • Confirm implementation of changes
  • Evaluate and test web site
  • Debug web site
3.6
  • Week of May 2
  • Prepare deliverables
  • Email deliverables to Dr. Klaskey

4 . ORGANIZATIONAL RESPONSIBILITIES

org chart goes here

5. REQUIREMENTS ANALYSIS

Requirement Responsibility
   
1. Develop main page of website Development
   
1.1 Describe system, its elements and how they interact Design
1.2 Illustrate system with a diagram Design
1.3 Implement links to other pages of case study Production
1.4 Implement project personnel and history page Project control
1.5 Implement a site map page Production
   
2. Develop model of a dynamic system Development
   
2.1 Write a description of the system and elements Design
2.2 Illustrate system with a diagram Design
2.3 Illustrate system with a free-body diagram Design
2.4 Write state-variable and output equations for system Design
2.5 Write input-output equations for the system Design
2.6 Present solution for the system outputs Design
2.7 Present analysis of system stability Design
2.8 Present a plot of the system Design
   
3. Test and evaluate the web site Testing and Evaluation
   
4. Complete deliverables
   
4.1 Deliver URL to Project Management Production
4.2 Email URL to Dr. Laskey Project Management
4.3 Email individual estimated allocations of credit to project management Project Management
4.4 Email allocation of credit for group to Dr. Laskey Project Management

 


 


Home | History | About us | System Analysis | Sitemap | Email
This is an educational website designed and maintenaned by Julia Maslov