A
few days later... The conference room
was set up for TP's planning meeting. Ugh was going to
outline the project plan that would guide TP from design all the way through testing.
Their plan called for a two-tier Organizational Structure that would be used for all communications between teams. This
structure is outlined below.

In Ugh's structure, there was no direct communication between teams. All
interactions would have to go through the management team, headed of course by Ugh. This
gave Ugh the control he liked to have, made him powerful. The problem was, it put in an
unnecessary bottleneck that would slow things down every time something came up that
required the teams to coordinate with each other ( which was often).
Design was to begin that week. Marty McFly, Pedro Villa, and Sheila were assigned to the Design Team. The
Manufacturing Team was assigned the task of developing the production line. This was just
where Big Al liked to be--knee deep in grease. And the
Testing Team was going to do nothing because they had nothing to test. This suited Gramma just fine - she could catch up on her needlepoint. Of course Stewart was happy as a pig in slop, since he could spend all of
his time in the arcade. But time and money was being wasted and TP would pay for it
later. You see, Gramma and Stewart are poorly utilized at the beginning, but, as you will
see, become overloaded with work toward the end. Had Pops and Ugh considered employing
some Project Management
methods, they may have been able to avoid this. |
|