| A few days later... The conference room was set up for TP's planning
meeting. Ugh was going to outline the project plan that would
guide TP from design all the way through testing. Their plan called for a two-tier Organizational Structure that would be used for all communications between teams. This
structure is outlined below.

In Ugh's structure, there was no direct
communication between teams. All interactions would have to go through the management
team, headed of course by Ugh. This gave Ugh the control he liked to have, made him
powerful. The problem was, it put in an unnecessary bottleneck that would slow things down
every time something came up that required the teams to coordinate with each other ( which
was often).
Design was to begin that week. Marty McFly, Pedro Villa, and Mr. Data were assigned to the Design Team. The Manufacturing Team
was assigned the task of developing the production line. This was just where Big Al liked to be--knee deep in grease. And the Testing
Team was going to do nothing because they had nothing to test. This suited Gramma just fine - she could catch up on her needlepoint. Of
course Stewart was happy as a pig in slop, since he
could spend all of his time in the arcade.
| But time and
money was being wasted and TP would pay for it later. You see, Gramma and Stewart are
poorly utilized at the beginning, but, as you will see, become overloaded with work toward
the end. Had Pops and Ugh considered employing some Project Management methods, they
may have been able to avoid this. |
|